_____
From: GROOVER.APRIL [mailto:[log in to unmask]]
Sent: Tuesday, January 29, 2008 4:49 PM
To: GROOVER.APRIL
Subject: FEC 2/11 Agenda
Meeting of the Florida Energy Commission
February 11, 2008
10:00 am* - Until Completion
Florida Atlantic University SeaTech Campus
SeaTech Auditorium
101 North Beach Road
Dania Beach, Florida 33004
(*9:00 - 9:55 am Tour of the research facilities of the Center of Excellence
in the Ocean Energy Technology. All Commission Members and meeting
attendees may participate in the tour and should arrive at the SeaTech
Auditorium shortly before 9:00 am. )
Commissioners: Tommy Boroughs, Chair
Honorable Lee Constantine
J. Sam Bell, Jr.
Harvey Ruvin
Dr. John O'Brien
Dr. Todd Sack
Joseph "Joe" Tannehill, Sr.
Michael Hightower
Dr. Frederick Driscoll
Agenda
I. Opening Comments**
Chairman Boroughs and Commission Members
II. Discussion of the Presentation of the Commission's 2007
Report to the Legislature
III. Comments by Senator Constantine on the Upcoming 2008
Legislative Session
IV. Discussion of the Use of Subcommittees and Advisory Groups
for the Upcoming Year
V. Discussion of the Following Commission Projects for 2008:
a. Examine Incentives to Encourage Energy Efficient Practices by
Utilities
b. Identify Strategies for Reducing Transportation Sector Greenhouse
Gas Emissions
c. Develop a Dedicated Funding Source for Energy-Related Programs
d. Identify Strategies to Reduce Greenhouse Gases and Address Climate
Change Issues
VI. Presentation by Florida Atlantic University: Overview of a
Center of Excellence in Ocean Energy Technology
VII. Public Comment Period
VIII. Discussion of the Commission's Meeting Schedule for 2008
IX. New Business
X. Closing Comments
Additional Information
If further information or if an accommodation is needed for a disability
(notification must be made within 48 hours of meeting date), please contact:
April Groover with the Florida Energy Commission at (850) 922-0999.
**The Commission will break for lunch and/or breaks at appropriate times as
determined by the Chairman.
Traveling to the SeaTech Campus
101 North Beach Road
Dania Beach, Florida 33004
* From Ft. Lauderdale/Hollywood International Airport. Head East along
I-595 and take first exit to US-1 (Federal Hwy.). Head south 1.1 miles and
turn left (at the sign for the State Park) onto Dania Beach Blvd. Travel
east 2 miles following signs to the Beach. Stay in the right lane across the
Intracoastal Waterway Bridge, then take the first exit to the Public Beach
area. SeaTech is the 2-story pink building on your left. Proceed through
gates to the parking lot.
* From the North on I-95. Exit at Griffin Road. Go east to US Highway
1 (Federal Highway). Turn right on US 1, travel South to Dania Beach Blvd.
Turn left (at the sign for the State Park) onto Dania Beach Blvd. Travel
east 2 miles following signs to the Beach. Stay in the right lane across the
Intracoastal Waterway Bridge, then take the first exit to the Public Beach
area. SeaTech is the 2-story pink building on your left. Proceed through
gates to the parking lot.
* From the South on I-95. Exit at Stirling Road. Head east for 1 mile
to US-1 (Federal Hwy). Turn left and head north 0.3 miles to Dania Beach
Blvd. Turn right onto Dania Beach Blvd and travel east 2 miles following
signs to the Beach. Stay in the right lane across the Intracoastal Waterway
Bridge, then take the first exit to the Public Beach area. SeaTech is the
2-story pink building on your left. Proceed through gates to the parking
lot.
FEC Staff Information
Executive Director & General Counsel - Greg Krasovsky
Program Director - Connie L. Ennis
Office Manager - April Groover
Policy Director - Rob Vickers
Communications Director - Alyssa D. Brown
http://www.floridaenergycommission.gov
(850) 922-0999
David E. Bruderly, PE
Bruderly Engineering Associates, Inc.
920 SW 57th Drive
Gainesville, Florida 32607-3838
352-377-0932
www.cleanpowerengineering.com <http://www.cleanpowerengineering.com/>
www.bruderly.com <http://www.bruderly.com/>
|